Archived topic

How can I change order of content to show on single post

5 replies · Started by Former User on March 10, 2020

Viewing posts 1–6 of 6

Hello,

I would like to change on single post the way of showing things, I would like information in the following way:

1. Breadcrums
2. Post Title
3. Post Date
4. Feature Image
5. Content
6. Category
7. Tags

Something like on the site bellow:
https://www.isitwp.com/wordpress-staging-site/

How I can do this?

Hi there,

That should be pretty standard. What issues are you having?

How I can do that then?

Hi there,

in Customizer > Layout > Blog --> Featured Images, select the Post tab and change Location to Below Title.

Then all you should need to do is add the Breadcrumbs, are you using an SEO plugin eg. Yoast ? If so which one ?

Ok so, with yoast seo plugin I can add breadcrum?

Thanks!

Yoast is one of the options that comes with Breadcrumbs. If the option is enabled in the plugin you can use one of two methods to display them in the Theme:

https://docs.generatepress.com/article/adding-breadcrumbs/

But its not the only option - other SEO plugins such as RankMath provides them or a dedicated Breadcrumb plugin like NavXT also works.

Let me know happy to help with any of the setups.

This archived topic is closed to new replies.